12-42. ARCTIC HEATER CONTROL BOX ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
a. Removal
INITIAL SETUP:
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Locknut (Appendix G, Item 70)
Lockwasher (Appendix G, Items 175)
Two lockwashers (Appendix G, Item 178)
Personnel Required
One mechanic
One assistant
Manual References
TM 9-2320-280-24P
Equipment Condition
Battery ground cable disconnected (para. 4-73).
TM 9-2320-280-20-3
Change 2
12-61
1.
Remove nut (6), washer (7), capscrew (11), and washer (7) and disconnect ground lead 416A (9)
from fuel pump bracket (10).
NOTE
Perform step 2 for vehicles not equipped with troop/cargo
winterization kit. Perform step 3 for vehicles equipped with
troop/cargo winterization kit.
2.
Disconnect lead 402 (4) from fuel pump lead 402A (5).
3.
Disconnect lead 402 (26) from fuel pump jumper lead (25).
4.
Remove nut (19), lockwasher (18), and washer (17) and disconnect leads 6B (20), 6C (21), and
400 (22) from power stud (8). Discard lockwasher (18).
5.
Remove nut (12) and lockwasher (13), and disconnect leads 416 (15) and 416A (14) from shunt (16).
Discard lockwasher (13).
6.
Remove locknut (23), capscrew (1), and clamp (2) from heater control box cable (3) and tunnel (24).
Discard locknut (23).