TM 9-2320-280-34
3 - 23.
ENGINE INSTALLATION (6.2L) (Cont ’d)
NOTE
Installation for the 100 amp and 200 amp Neihoff regulators
are basically the same.
Differences are shown in the
illustration.
91.
Apply sealing compound to threads of capscrew (10).
92.
Install spacer (14) and voltage regulator (12) on alternator (15) with lockwasher (11) and capscrew (10).
Tighten capscrew (10) to 88-94 lb-in. (10-11 N m).
93.
Install two washers (16), lockwashers (17) and screws (18) on voltage regulator (12) and
alternator (15).
Tighten screws (18) to 30-34 lb-in (3-4 N m).
94.
Install washer (1), lead 5A (2), and nut (3) on red (energize) terminal (19).
Tighten nut (3) to
23-27 lb-in. (2.6-3.0 N m). Slide rubber boot (4) over terminal (19).
95.
Install washer (8), lead 2A (7), and nut (6) on yellow (AC) terminal (9).
T
ighten nut (6) to 18-22 lb-in.
(2.0-2.5 N m). Slide rubber boot (5) over terminal (9).
96.
Connect regulator plug (13) to voltage regulator (12).
3-98