TM 9-2320-280-34
3 - 23.
ENGINE INSTALLATION (6.2L) (Cont ’d)
44.
Connect control valve hose (4) to control valve (7) and hydro-boost hose (6) to hydro-boost (8) and
tighten clamps (5) to 10-20 lb-in. (1-2 N m).
45.
Connect two clamps (3) with capscrew (2), washer (1), and nut (9).
46.
Connect high pressure line (10) to hydro-boost (8).
3-92