TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 106 of 1320

TM 9-2320-304-14&P
2-44
Operating Instructions (Cont)
2-9. LOAD HANDLING SYSTEM (LHS) (CONT).
WARNING
When loading or unloading flatracks on uneven ground (side slope or downgrades
up to 5 degrees), it may be necessary to apply truck service brakes to prevent truck
rollaway or severe injury or death to personnel could result.
Check for overhead power lines or other obstructions before attempting LHS
operation. LHS reaches a height of 17 ft. 2 in. (5.23 m) with ISO container. Serious
injury or death to personnel could result from contact with electrical power lines.
Trailer wheels must be chocked during transfer operations or serious injury or
death to personnel could result.
CAUTION
Load must be evenly distributed on flatrack. Uneven load distribution may cause
LHS OVER LOAD indicator to give false signals and cause LHS to operate
incorrectly.
Ensure rail transport locking pins are disengaged before unloading flatrack. Rail
transport locking pins are used for rail transport only. Failure to comply may result
in damage to equipment.
NOTE
The amount of time to load and unload is controlled by engine speed. Engine speed
can be increased to 1,500 to maximum rpm to reduce loading and unloading times.
LHS will only operate when transmission range selector is in N (Neutral).
(7)
Move joystick (10) to UNLOAD position until flatrack rollers (11) contact trailer.


Back to Top