TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 297 of 1320

TM 9-2320-304-14&P
2-82.147
Operating Instructions (Cont)
NOTE
It may be necessary to rotate rail transport strut 90 degrees to align holes.
(9)
Position rail transport strut (13) with either hole on front container support (14).
(10)
Install pin (12) and lock pin (11) to rail transport strut (13) and front container support (14).
(11)
Repeat steps (1) through (10) for left side.
b. Rail Transport Strut Removal.
NOTE
There are two rail transport struts and ISO corner locks. Both are removed the same way.
Right side shown.
(1)
Support rail transport strut (1), remove lock pin (2) and pin (3).
Change 1


Back to Top