TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 671 of 1320

TM 9-2320-304-14&P
4-233
Organizational Maintenance Instructions (Cont)
b. Installation.
NOTE
Left-hand bracket must be rotated under
hydraulic hoses to install.
(1)
Install brackets (1 and 2) on frame
rail (3) with screws (4) and locknuts (5).
(2)
Install deck (6) on brackets (1 and 2)
with four screws (7), four springs (9),
eight washers (8), and four
locknuts (10).
(3)
Install bracket (11) on bracket (2) with
two screws (12) and locknuts (13).
c. Follow-on Maintenance.
Remove wheel chocks
(TM 9-2320-279-10).
END OF TASK


Back to Top