TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 856 of 1320

TM 9-2320-304-14&P
5-106
Direct Support and General Support Maintenance (Cont)
5-23.
LOAD HANDLING SYSTEM (LHS) HOOK ARM REPAIR (CONT).
d. Assembly.
NOTE
Apply light coat of grease to outer
surface of bushings prior to
installation.
Apply light coat of grease to threads
of removal/installation tool prior to
use.
(1)
Using hook arm and main frame
bushing removal/installation tool (use
fiveofsixpieces)
,alinelubeholein
bushing (1) with lube fitting hole in
hook arm (2) and install two bushings in
hook arm as shown.
NOTE
If lube fitting hole is restricted by bushing,
go to step
(4)
of removal.
(2)
Check lube fitting hole in hook arm (2)
for restrictions.
(3)
Install two lube fittings (3) in hook
arm (2).
NOTE
Apply light coat of grease to outer edges of
seals prior to installation.
(4)
Install four seals (4) in hook arm (2).
(5)
Install two rubber bumpers (5) on hook
arm (2) with two locknuts (6).


Back to Top