TM 9-2320-328-13&P-1
0033-3
DRAFT
0033
Change 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Perform Step (9) only if foam system and foam agent tank is going to be left in a “dry
condition”.
9.
Drain and flush foam agent from foam tank (WP 0022).
NOTE
Ensure all inlet and discharge valve controls are in closed position before proceeding.
10. Put WATER TANK DRAIN switch (4) to OPEN position.
Indicator light (5) will illuminate.
Keep WATER TANK
DRAIN valve in open position during entire procedure.
11. Put FOAM FLUSH switch (6) to ON position.
Indicator light (7) will illuminate.
12. Open manual FOAM METERING valve (8) to fully open position.
HWT1443A