TM 9-2320-328-13&P-2
0158-19/(20 blank)
DRAFT
0158
FOLLOW-ON MAINTENANCE
1.
Install primer pump (WP 0165)
2.
Install bumper turret valve (WP 0312)
3.
Install hydrostatic pump motor (WP 0151)
4.
Fill water pump gear case (WP 0157)
5.
Install hydraulic heat exchanger (WP 0134)
6.
Install pump house panel K (WP 0339)
7.
Check for proper operation and leaks
END OF TASK
END OF WORK PACKAGE