personnel and obstructions, and overhead clearance is at least 22 ft.
2 in. (6.7 m) above the loading area. Failure to conduct a site survey
could cause the vehicle to slip, turn over, crash into an obstruction,
or contact power lines. Failure to comply may result in injury or death
to personnel.
•
Unloading the BAP without disengaging hold-down locks may result
in injury or death to personnel.
•
Water velocity should not be greater than 8 ft. (2.4 m) per second.
Refer to TM 5-5420-290-12 for water velocity requirements for all
launch conditions. Failure to comply may result in injury or death to
personnel.
1.
A site survey must be conducted to ensure the site meets the criteria cited in the warning
above.
OPERATION
1.
Check transfer site for 22 ft. (6.7 m) overhead clearance, ground firmness, and level
within one percent slope in all directions.
2.
Align rear of vehicle with the BAP. Stop approximately 5 ft. (1.5 m) from the BAP.
NOTE
Dashboard parking brake indicator will illuminate when PARKING
BRAKE control is applied.
3.
Pull out PARKING BRAKE control (1) or apply service brake pedal (2).
TM 9-2320-346-10
0045