TM-9-2320-346-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8 M1977A4 W/WINCH AND M1977A4 W/O WINCH

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-346-10 - Page 765 of 1184

OPERATOR MAINTENANCE
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BRIDGE ADAPTER
PALLET (BAP)
INITIAL SETUP:
Not Applicable
PERFORM PROCEDURE
WARNING
Do not attempt to lift a load greater than the rated load capacity of crane
or materiel-handling equipment. Failure to comply may result in injury or
death to personnel and damage to equipment.
NOTE
Manual mode operations using the cab control box are to be
performed only when the normal AUTO mode electric circuit is
malfunctioning.
This procedure is performed when a loaded BAP must be removed
using a crane or other handling system and must be done with help
of a higher maintenance level.
The BAP weighs 5,810 lbs (2 637 kg). The BAP with bridge bay
weighs 24,148 lbs (10 963 kg).
1.
Ensure main frame is fully stowed.
2.
Ensure that, if necessary, main frame is lowered using loading button of the solenoid
bypass procedure as necessary (WP 0106).
3.
Secure winch frame to the BAP. and ensure two winch frame locking levers (1) are in
the up position.
////////////////////////////////////////////////////////////////////////////////////
TM 9-2320-346-10
0110
0110-1
////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////


Back to Top