2-32. OPERATION OF EARTH BORING AND POLESETTING
MAINTENANCE TRUCKS (Contd)
j. Pulling Poles.
CAUTION
Make sure pole is strong enough to take pull without breaking
efore pulling pole. Use pole jack, or dig alongside pole to
break suction under pole, as necessary. Failure to do so may
result in damage to equipment.
(1)
Wrap jack chain (9) around pole (7) and operate jack handle (8) to loosen
pole (7).
(2)
Position truck so derrick sheave (1) almost touches pole (7), rig cable (2)
for derrick operation (refer to e. of this para.), and attach cable (2) to pole (7)
above balance point.
(3)
Lower outrigger legs (4) (refer to b. of this para.) and attach guideline (6)
to lower part of pole (7).
(4)
Operate winch (refer to d. of this para.) to slowly raise pole (7) until it is
clear of hole (5).
(5)
Using guideline (6) to direct, slowly lower pole (7) to ground.
(6)
Block pole (7) to keep it from rolling, and remove guideline (6) and
cable (2).
(7)
If hole (5) is not to be used, fill it with dirt and tamp it down.
(8)
Raise and secure outrigger legs (4) (refer to b. of this para.), lower and
secure derrick (3) (refer to c. of this para.), and secure winch (refer to d. of
this para.).
k. Operating Collapsible Cable Reel.
WARNING
The cable reel is heavy and may require the derrick and
winch to load/unload it. Failure to lift reel properly may
result in injury or death to personnel.
2-177


Back to Top