TM 9-2320-361-10
2-32. OPERATION OF EARTH BORING AND POLESETTING
MAINTENANCE TRUCKS (Contd)
(3)
Collapse cable reel (3) by turning operating handle (9) left until sliding
spider (8) separates from handle (9). Push in spider (8) to completely collapse
cable reel (3). Cable may now be installed on rim segments (7).
(4)
Pull sliding spider (8) forward and turn operating handle (9) right to mesh
with spider (8). Continue turning handle (9) as far as it will go.
(5)
Start engine (refer to para, 2-14 or 2-15), depress clutch pedal (10), place
transfer case shift lever (12) in neutral, and engage transfer power takeoff lever
(16).
CAUTION
Make sure winch control lever is locked in neutral, or damage
to equipment may result.
(6)
Place winch control lever (15) in neutral, power divider control lever (13)
in REAR WINCH FWD and transmission gearshift lever (14) in “1” (first) or
“2” (second) position.
(7)
Slowly release clutch pedal (10) and depress accelerator pedal (11)
enough to prevent engine stalling.
2-179