TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 446 of 1144

TM 9-2320-361-24-2
0315 00
0315 00-10
115- AND 24-VOLT WIRING HARNESS REPLACEMENT (Contd)
REMOVAL (Contd)
NOTE
Perform steps 41 and 42 for M185A3 vehicles.
41.
Remove bushing (5) from nipple (6) and safety switch box (2).
42.
Remove START/STOP switch (9), two screws (7), switch bracket (8), and spacer (10) from van
wall (11).
43.
Remove four nuts (4), lockwashers (3), and safety switch box (2) from two mounting brackets (1).
Discard lockwashers (3).
NOTE
Safety wire will be used to install new wiring harness. Do not
cut safety wire from spool until harness has been pulled from
van and proper length has been obtained.
44.
Attach safety wires (14) to wire leads (12), (13), (16), (18), and (19).
45.
Remove three grommets (17) from van wall (11) and wire leads (12), (13), and (16).
46.
Remove two grommets (20) from van wall (11) and wire leads (18) and (19).
47.
Pull wire leads (12), (13), (16), (18), and (19) out of van wall (11).
48.
Remove safety wires (14) from wire leads (12), (13), (16), (18), and (20).
49.
Cut safety wires (14) from spools (15).


Back to Top