TM 9-2320-361-24-2
0455 00
0455 00-24
DIFFERENTIAL CARRIER REPAIR (Contd)
ASSEMBLY AND ADJUSTMENT (Contd)
65.
Install new safety wire (11) on two screws (10).
66.
Install bearing cover (8) and shims (9) on carrier (12) with six new lockwashers (6) and screws (7).
Tighten screws (7) 65–85 lb-ft (88–115 N
•
m).
67.
Remove flange (4) from pinion end of shaft (13).
68.
Perform step 69 if dirt deflectors (5) were removed.
69.
Install two dirt deflectors (5) on two flanges (4).
NOTE
• Apply light coat of GAA grease to splines of flanges before
installation.
• Flanges must be installed with four holes aligned.
• Before tightening nuts, secure flanges in vise.
• Ensure cotter pin holes are aligned before removing carrier
from vise.
70.
Install spacer (14) and two flanges (4) on carrier (12) with two washers (3) and nuts (1). Tighten
nuts (1) 300–600 lb-ft (407–814 N
•
m).
71.
Install two new cotter pins (2) in two nuts (1).