TM-9-2320-362-14-P

TRUCK UTILITY: S250 SHELTER CARRIER, 4X4, M1037 FOR TRAFFIC JAM AN/TLQ-17A(V)3 (HMMWV)

TECHNICAL MANUAL; OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR ELECTRICAL ENVIRONMENTAL SYSTEM (EES)

APRIL 1992

  TM-9-2320-362-14-P - Page 184 of 353

TM 9-2320-362-14&P
4-18. EES KIT INSTALLATION (Cont’d)
ee.
Cable Assembly W66 Installation
1.
2.
3.
4.
5.
6.
Use figure
installing
Install loop clamp
NOTE
3-2, Engine Electrical Interface, when
cable assembly W66.
(5) on cable assembly W66 (11).
Apply conductive antiseize compound to terminal lug (13) on wire
no. 798 (9) and terminal lug (14) on wire no. 58 (12).
Install safety tab (6), loop clamp (5), wire no. 798 (9), and wire
no. 58 (12) to engine block (7) and secure with screw (10).
Route wires no.
798 (9) and no. 436 (2) along engine wiring
harness (8) and across engine to compressor.
Connect wire no.
798 (1) into wire no. 798 (4) (on compressor).
Connect wire no. 436 (2) into wire no. 436 (3) (on compressor).
4-72


Back to Top