TM-9-2320-362-14-P

TRUCK UTILITY: S250 SHELTER CARRIER, 4X4, M1037 FOR TRAFFIC JAM AN/TLQ-17A(V)3 (HMMWV)

TECHNICAL MANUAL; OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR ELECTRICAL ENVIRONMENTAL SYSTEM (EES)

APRIL 1992

  TM-9-2320-362-14-P - Page 174 of 353

TM 9-2320-362-14&P
4-18.
EES KIT INSTALLATION (Cont’d)
x. 200 Amp Alternator Connectors Installation
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Cut wire no.
2A (1) halfway between regulator and wire harness
jacket.
Slide rubber shell (3) and plastic sleeve (4) from connector (2)
onto wire no.
2A (1) (regulator side).
Strip insulation on wire no.
2A (1) to equal depth of terminal well
on connector terminal (5).
Insert end of wire no, 2A (1) into terminal well and crimp.
Solder crimped joint between connector terminal (5) and wire no.
2A (1).
Slide rubber shell (3) and plastic sleeve (4) onto connector
terminal (5).
Plug connector (2) into 3-way connector (6).
Slide rubber shell (10) onto wire no.
2A (1) (wire harness side).
Strip insulation on wire no.
2A (1) to equal depth of terminal
well on connector terminal (8).
Insert end of wire no. 2A (1) into terminal well.
Solder joint between connector terminal (8) and wire no. 2A (1).
Place slotted washer (9) over soldered junction on connector
terminal (8).
Slide rubber shell (10) over slotted washer (9) on connector
terminal (8).
Plug wire no.
2A (1) into adapter (7) and adapter (7) into 3-way
connector (6).
4-62


Back to Top