TM-9-2320-362-14-P

TRUCK UTILITY: S250 SHELTER CARRIER, 4X4, M1037 FOR TRAFFIC JAM AN/TLQ-17A(V)3 (HMMWV)

TECHNICAL MANUAL; OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR ELECTRICAL ENVIRONMENTAL SYSTEM (EES)

APRIL 1992

  TM-9-2320-362-14-P - Page 200 of 353

TM 9-2320-362-14&P
4-18.
EES KIT INSTALLATION (Cont’d)
NOTE
It may be necessary to lift floor insulation to
find location of perforations.
6.
7.
Cut out floor insulation (6) at perforations (7). Mark outline of
perforation on floor.
Roll back floor insulation (6).
Place rifle mount (2) on floor (9) so that base of rifle mount (2)
is centered in outline and rests flat against inclined section of
floor (9).
Using rifle mount (2) as template, determine center of three
holes (1).
Remove rifle mount (2).
8.
WARNING
When drilling,
be sure to wear goggles for eye
protection or injury to personnel may occur.
Avoid skin contact with paint, primer, remover,
and thinner particularly if there are cuts or
open wounds on the hand.
Failure to do so
could result in serious injury.
Using 3/8-inch drill bit, drill three holes (1) into floor (9).
Using three capscrews (3), six washers (4), and three self-locking
nuts (8), install rifle mount (2) onto floor (9) of vehicle.
Roll floor insulation (6) back over rifle mount (2).
9 .
10.
11.
4-88


Back to Top