TM-9-2320-362-14-P

TRUCK UTILITY: S250 SHELTER CARRIER, 4X4, M1037 FOR TRAFFIC JAM AN/TLQ-17A(V)3 (HMMWV)

TECHNICAL MANUAL; OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR ELECTRICAL ENVIRONMENTAL SYSTEM (EES)

APRIL 1992

  TM-9-2320-362-14-P - Page 202 of 353

TM 9-2320-362-14&P
4-18. EES KIT INSTALLATION (Cont’d)
ii. Ladder Mount Installation
1.
2.
3.
4.
5.
6.
7.
Remove two plastic cap plugs (1) from wheelhouse (6).
Using ladder retaining bracket (4) as a template, align two holes
in ladder retaining bracket (4) with two holes in wheelhouse (6).
Determine center of third hole (5) and remove ladder retaining
bracket (4).
WARNING
When drilling,
be sure to wear goggles for eye
protection or injury to personnel may occur.
Avoid skin contact with paint, primer, remover,
and thinner particularly if there are cuts or
open wounds on the hand.
Failure to do so
could result in serious injury.
Using 9/32-inch drill bit,
drill hole (5) in wheelhouse (6).
Secure ladder retaining bracket (4) to wheelhouse (6) with
screws (2), washers (3), and self-locking nuts (15).
Install ladder strap assembly (10) to ladder strap bracket (13) and
secure with screws (14) and nuts (12).
Remove two screws (11), washers (8),
and self-locking nuts (7) that
secure tailgate bracket (9) to wheelhouse (6). Remove tailgate
bracket (9) and retain screws (11), washers (8), and self-locking
nuts (7),
Place ladder strap bracket (13) over tailgate bracket (9).
Secure
with two screws (11), washers (8), and self-locking nuts (7).
4-90


Back to Top