TM 9-2320-365-20-3
Change 2
13-11
13-6.
STEERING COLUMN REPLACEMENT
This task covers:
a.
Removal
b.
Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Turn signal switch removed (para 7-25).
Cab raised (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Tools and Special Tools (Cont)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix
C)
Wrench Set, Socket (Item 49, Appendix C)
Gloves, Rubber (Item 13, Appendix C)
Materials/Parts
Sealing Compound
(Item 68.3, Appendix D)
Washer, Spring (2) (Item 279, Appendix G)
Locknut (Item 60, Appendix G)
Nut, Self-Locking (4) (Item 116, Appendix G)
a. Removal.
(1)
Remove four self-locking nuts (1), eight washers
(2), and four screws (3) from steering column
assembly (4). Discard self-locking nuts.
(2)
Remove locknut (5) and bolt (6) from steering gear
arm universal joint (7).
Discard locknut.
(3)
Disconnect steering gear arm universal joint (7)
from steering gear input shaft (8).
(4)
Lower cab (TM 9-2320-365-10).