CONTINUITY TEST
(1)
Remove circuit breaker CB70 from PDP.
(2)
Position master power switch to on
(TM 9-2320-366-10-1).
(3)
Set multimeter to ohms.
(4)
Connect positive (+) probe of multimeter to
relay K2 socket 86 on PDP.
(5)
Connect negative (-) probe of multimeter to
circuit breaker CB70 socket 4 on PDP and
note reading on multimeter.
(6)
If continuity is not present, go to step 14
of this fault.
(7)
Position master power switch to off
(TM 9-2320-366-10-1).
(8)
Install circuit breaker CB70 in PDP.
TM 9-2320-366-20-1
Change 1
2-277