TM 9-2320-366-20-2
Change 1
2-1543
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
worklights switch terminal 1.
(3)
Connect negative (-) probe of multimeter to
worklights switch terminal 5.
(4)
Position worklights switch to on
(TM 9-2320-366-10-1) and note reading on
multimeter.
(5)
If continuity is not present, replace
worklights switch (para 7-18).
(6)
Connect connector P905 to worklights
switch.
(7)
Position auxiliary panel on auxiliary panel
housing with six screws.
(8)
Tighten six screws to 24 lb-in. (3 N·m).