TM 9-2320-366-20-4
16-178
Change 2
16-23.
M1089 TOOL BOX REPLACEMENT/REPAIR (CONT)
(2)
Position eight screws (3), 16 washers (4), and eight
self-locking nuts (5) on tool box (1).
(3)
Tighten eight self-locking nuts (5) to 19-25 lb-ft (26-
34 N
•
m).
NOTE
Perform steps (4) and (5) on front tool box.
(4)
Install towbar (6) on tool box (7) with nut (8).
(5)
Install bracket (9) on tool box (7) with nut (10).
WARNING
NOTE
Step (3) requires the aid of two assistants.
Towbar weighs approximately 150 lbs (68
kgs).
Attach a suitable lifting device prior
to installation.
Failure to comply may
result in injury to personnel or damage to
equipment.