TM 9-2320-366-20-4
12-8. FRONT AXLE CENTRAL TIRE INFLATION SYSTEM (CTIS) QUICK RELEASE
VALVE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Air tanks drained (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape (Item 20,
Appendix D)
Antiseize Compound (Item 58, Appendix D)
Nut, Self-Locking (2) (Item 167, Appendix G)
WARNING
Wear appropriate eye protection when
working
under
vehicle
due
to
the
possibility of falling debris. Failure to
comply may result in injury to personnel.
a. Removal.
NOTE
Tag air hoses and connection points before
disconnecting.
(1) Disconnect three air hoses (1) from quick release valve
(2).
(2) Remove two self-locking nuts (3) and washers (4) from
screws (5). Discard self-locking nuts.
(3) Remove two screws (5), washers (6), and quick release
valve (2) from frame (7).
Change 1
12-19