TM 9-2320-366-20-5
Change 2
19-94.3/19-94 Blank
d. Installation.
(1)
Position bracket (1) on frame rail (2) with two bolts
(3) and self-locking nuts (4).
(2)
Position bolt (5) and self-locking nut (6) in bracket
(1).
(3)
Position bolt (7) and self-locking nut (8) in bracket
(1).
(4)
Tighten two self-locking nuts (4) and self-locking
nuts (6 and 8) to 210-225 lb-ft (285-305 N•m).
(5)
Install insulators (9 and 10) on bracket (1).
(6)
Install insulator strap (11) on strap (12).
(7)
Position strap (12) on bracket (1) with bolt (13)
and self-locking nut (14).
(8)
Tighten self-locking nut (14) to 39-47 lb-ft
(52-64 N•m).
(9)
Install preformed packing (15) on 90-degree fitting
(16).
(10) Install 90-degree fitting (16) in hydraulic reservoir
(17).
(11) Install preformed packing (18) on fitting (19).
(12) Install fitting (19) in hydraulic reservoir (17).
(13) Position hydraulic reservoir (17) in bracket (1) with
strap (12) positioned around hydraulic reservoir
(17).
NOTE
Apply lubricating oil to preformed packings
during installation.