TM 9-2320-366-20-5
20-542
Change 2
20-83.
DIGITIZATION KIT AFT STOWAGE BOX REPLACEMENT/REPAIR (CONT)
b. Disassembly.
(1)
Remove six self-locking nuts (18), side panel
(19), six washers (20), and screws (21) from AFT
Storage Box (13). Discard self-locking nuts.
(2)
Remove three self-locking nuts (22), bracket (23),
three washers (24), and screws (25) from AFT
Storage Box (13). Discard three self-locking nuts.
(3)
Remove three nuts (26), lockwashers (27), and snap
screws (28) from AFT Storage Box (13).