TM 9-2320-366-34-3
Change 2
17-14.1
(2)
Remove four preformed packings (4) from valve
body (3).
Discard preformed packings.
(3)
Remove three caps (5) from tee fittings (6).
(4)
Remove three tee fittings (6) and fitting (7) from
valve body (3).
(5)
Remove four preformed packings (8) from three
tee fittings (6) and fitting (7).
Discard preformed
packings.
(6) Remove relief valve (9) from valve body (3).
(7) Remove three preformed packings (10) and four
back-up rings (11) from relief valve (9).
Discard
preformed packings and back-up rings.
NOTE
Note orientation of tee fittings prior to
removal.
NOTE
Tag valves and valve body prior to
removal.