TM 9-2320-366-34-4
18-78
Change 2
18-7.
DIGITIZATION KIT INITIAL INSTALLATION
This task covers:
a. Installation
b. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Batteries disconnected (TM 9-2320-366-20-3).
Cab storage boxes removed (TM 9-2320-366-20-4).
Seat belts removed (TM 9-2320-366-20-4)
Small arms mounts removed (TM 9-2320-366-20-4)
Rear boarding handles removed (TM 9-2320-366-20-
4)
RH seat removed (TM 9-2320-366-20-4)
Power distribution panel removed for access (TM 9-
2320-366-20-4)
Kick panel removed (TM 9-2320-366-20-4)
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Goggles, Industrial (Item 28, Appendix B).
Drill Electric, Portable (Item 21, Appendix B)
Drill Set, Twist (Item 20, Appendix B)
Machine Gun Ring Drill Stop (Item D12, Appendix D)
Tools and Special Tools (Cont.)
Clamp (2) (Item 13, Appendix B)
Wrench, Torque (0-200 lb-in) (Item 93, Appendix
B)
Wrench Set, Socket (Item 85, Appendix B)
Drill Stop Collar Set (366-20 Appendix B)
Materials/Parts
Ties, Cable Plastic (Item 99, Appendix C)
Rivet, Compression (4) (Item 365.1, Appendix F)
Sealant (Item 65.1, Appendix C)
Antiseize (Item 12.1, Appendix C)
Personnel Required
(2)
Reference Material
TB43-0242
a. Installation
(1)
Position RH template (1) on rear cab wall (2) with
two screws (3).
(2) Drill two 3/16” (5 mm) pilot holes at locations (4).
(3)
Remove two screws (3) and template (1) from rear
cab wall (2).
WARNING
CAUTION
Wear appropriate eye protection when
drilling holes.
Failure to comply may
result in injury to personnel.
Drill bit stop must be used to limit the depth
of drill bit travel.
Failure to comply may
result in damage to cab.