TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 503 of 1555

TM
9-2320-387-24-2
I
12-45. HYDRO-BOOST VENT LINE REPLACEMENT
~~
1
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Applicable
hlodels
Ml113
Tools
General mechanic’s tool kit:
automotive
(Appendix
B, Item 1)
hIaterials/F’arts
Locknut
(Appendix
G, Item 1541
Nut and lockwasher
assembly
(Appendix G, Item 244)
hlanual
References
TM 9-2320-387-24P
Equipment
Condition
Engine left splash shield removed
(para. 10-231.
Maintenance
Level
Unit
pI7ciGq
1.
Disconnect
hydro-boost
vent line (21 from hydro-boost
(1).
2.
Remove nut and lockwasher
assembly
(31, capscrew
(101, clamp (41, harness
clamp (91, and vent
line (21 from body (11). Discard nut and lockwasher
assembly
(3).
3.
Remove locknut (61, washer
(71, capscrew
(81, washer
(71, clamp (51, and vent line (2) from body (11).
Discard locknut (61.
4.
Remove two clamps (4) and (5) from vent line (2).
b. Installation
1.
Install two clamps (4) and (51 on vent line (2).
2.
Install vent line (2) and clamp (5) on body (11) with washer
(71, capscrew
(81, washer
(71, and
locknut (6). Tighten
capscrew
(8) to 6 lb-ft (8 Nom).
3.
Install vent line (21, harness
clamp (91, and clamp (4) on body (11) with capscrew
(10) and nut and
lockwasher
assembly
(3).
4.
Connect vent line (2) to hydro-boost
(1).
FOLLOW-ON
TASK: Install engine left splash shield (para. 10-23).
i
2-80


Back to Top