TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 621 of 1555

TM 9-2320-387-24-2
1527.
ENGINE PREPARATION
(Cont’d)
3.
4.
3.
6.
7.
8.
Install wiring harness bracket (8) on oil pan (5) with two lockwashers (6) and nuts (7).
Install left and right engine mount and insulator assemblies (9) on engine (4) with three lock-
washers (10) and capscrews (11). Using 9/16-in. torque adapter, tighten capscrews (11) to
30-40 lb-ft (41-54 Nom).
WARNING
Starter must be supported during installation. Failure to support
starter may cause injury to personnel or damage to equipment.
Position shim(s) (12), if removed, and starter (13) on flywheel housing (20) with solenoid (14) facing
outward.
Slide front of starter (13)
in
bracket (17), ensuring bracket (17) is between washer (15) and
starter (13).
Apply thread-locking compound to capscrews (18). Install two washers (19) and capscrews (18) on
starter (13) and engine (4). Tighten capscrews (18) to 30-40 lb-ft (41-54 N-m).
Using crowfoot, tighten locknut (16) to 15-19 lb-ft (20-26 N-m).
15-89


Back to Top