TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 635 of 1555

TM9-2320-387-24-2
1528.
ENGINE INSTALLATION
(Cont’d)
NOTE
l
It will be necessary to rotate flywheel clockwise from capscrew
in front of crankshaft to gain access to install capscrews to
torque converter.
l
Have assistant hold crankshaft pulley in place when installing
flywheel to torque converter.
17.
Align torque converter (27) to flywheel (25) and install six capscrews (26).
18.
Tighten capscrews (26) to 32 lb-R (43 N-m).
NOTE
Gaskets may require bending over edge of converter housing cover
to make gaskets seal properly.
19.
Apply RTV sealant to upper converter housing cover gasket (32). Install gasket (32) and upper
converter housing cover (33) on transmission (28) with four capscrews (34).
20.
Apply RTV sealant to lower converter housing cover gasket (29). Install gasket (29) and lower
converter housing cover (30) on transmission (28) with two capscrews (31).
:
UPPER
15103


Back to Top