TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 749 of 1555

TM
9-2320-387-24-2
19-4. TRANSMISSION/TRANSFER
CASE ASSEMBLY INSTALLATION
(Cont’d)
11.
Remove safety chain and lower transmission (1).
NOTE
It will be necessary to rotate
flywheel clockwise from capscrew in
front of crankshaft to gain access to capscrews securing torque
converter.
12.
Align
torque converter (2) with holes in flywheel (4). Install torque converter (2) on flywheel (4)
with six capscrews (3).
13.
Tighten capscrews (3) to 32 lb-R (43 N-m).
19-10


Back to Top