TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 782 of 1555

TM 9-2320-387-24-2
1 21-8.
FRONT PROPELLER SHAFT MAINTENANCE
I
I
I
This task covers:
a.
Disassembly
b.
Assembly
INITIAL SETUP:
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Manual References
TM 9-2320-387-24P
Equipment Condtion
Front propeller shaft disassembled
(para. 6-3).
hlaintenance Level
Direct support
a. Disassembly
1.
Install bearing puller between center bearing (3) and shield (4).
2.
Remove center bearing (3) and retainer (1) from coupling shaft (5).
3.
Remove shield (4) from coupling shaft (5).
-1
1.
Install shield (4) on coupling shaft (5).
2.
Press center bearing (3) on coupling shaft (5) until seated against shoulder (6). Ensure flange (2) on
center bearing (3) faces up.
3.
Press bearing retainer (1) on coupling shaft (5).
BEARING PUUER
L
FOLLOW-ON
TASK: Assemble front propeller shaft (para. 6-3).
21-19


Back to Top