Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
(9) Move HOIST control
lever in UP position to
reel in cable.
Cable does
not reel in.
(10)Move HOIST control
lever in DOWN position
to pay out cable.
Cable does
not pay out.
NOTE
For more information on ma-
terial handling crane remote-
control operating instructions,
refer to grove crane operation
(remote- control) procedures.
(WP 0043)
4. Check crane remote-control
levers as follows:
TM 9-2320-432-10
0148
0148-45