OPERATION - Continued
CAUTION
BAP hold-down locks must be unlocked from the LHS prior to
commencing BAP unloading operations. Failure to release BAP hold-
down locks could result in damage to equipment.
2.
If NATO flatrack is loaded, inspect load, and ensure it is secure and weight of load
does not exceed 10 tons (9 metric tons).
3.
Set transmission range selector (1) to R (reverse) and back up vehicle so there is at
least 6 ft. (2 m) of clearance behind vehicle for loading NATO flatrack.
4.
Pull out PARKING BRAKE control (2) and set transmission range selector (1) to N
(neutral).