TM-9-2320-435-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8, M1977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-435-10 - Page 447 of 1168

OPERATION - Continued
22
21
Figure 9.
CAUTION
Ensure trailer air system is pressurized before beginning removal, or BAP
locks may not disengage properly. Damage to equipment may result.
NOTE
The time it takes for loading and unloading is controlled by engine speed.
To reduce loading and unloading times, engine speed can be increased
to approximately 1200 rpm by engaging HIGH IDLE switch.
22.
Move joystick (18) to LOAD until LHS lift hook (19) engages BAP hook bar (20).
TM 9-2320-435-10
0051
0051-11


Back to Top