TM 9-2320-440-13&P
0139-2
0139
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Shafts should remain in extended position after being pulled out.
5.
Cut and remove two safety wires (6) securing two solenoid shafts (7 and 8).
6.
Pull out two solenoid shafts (7 and 8) approximately 0.13 in. (3.3 mm) and turn counterclockwise one quarter
turn.
7.
Push and hold palm button switch (9).
WARNING
When operating MRP elevation cylinders,
personnel must stay clear of cylinders.
Failure to comply may result in serious injury or death to personnel.
NOTE
Cylinder head must be extended approximately 7.5 in. (19.05 cm).
8.
Use lever (10) and extend cylinder head (11).
9.
Shut off engine (
THAAD0141
TM 9-2320-347-10)