TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 733 of 1616

TM 9-2320-440-13&P
0095-13
0095
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Left and right side bulkhead fittings and unions are installed the same way.
Left side
shown.
9.
Install bulkhead union (12) on compression frame (7) with nut (16).
10. Lightly lubricate preformed packing (13) with clean oil.
11. Install nut (11), compression ring (15), spacer (14), and preformed packing (13) on tube (6).
12. Install tube (6) on bulkhead union (12) with nut (11).
13. Install two bulkhead fittings (10) on compression frame (7) with two lockwashers (9) and nuts (8).
14. Repeat steps (9) through (13) for right side.
THAAD0614


Back to Top