TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 139 of 462

TM 9-2330-238-14
4-27. DOMELIGHT MAINTENANCE (M749) (Con’t).
c.
CLEANING AND INSPECTION
1.
Wipe all parts with a clean, dry cloth.
2.
Inspect
3.
Inspect
4.
Inspect
lens for cracks or breaks.
wiring for broken insulation or bare wires
all mounting hardware for damage.
5.
Replace all defective parts as necessary.
d .
INSTALLATION
1.
Connect electrical leads (8) to back side of socket (7). Remove tags
2.
Position light assembly (1) in ceiling and install four screws (2).
3.
Position lens (4) in place in fixture door (5).
4.
Install lamp (3) and fixture door (5) in light assembly (1) with two nuts (6).
FOLLOW-ON TASKS:
Connect external power supply cable.
Test operation of domelight.
4-41


Back to Top