TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 137 of 462

TM 9-2330-238-14
4-6. BLACKOUT MELIGHT AND EMERGENCY DOMELIGHT MAINTENANCE (ALL
EXCEPT M749) (Con’t).
c.
CLEANING AND INSPECTION
1.
Clean all parts with a clean, dry cloth.
2.
Inspect domelight body for dents in the reflector, and broken or chipped socket and socket retainer.
3.
Inspect wiring for broken insulation or bare wire.
4.
Replace all damaged parts.
d. INSTALLATION
1.
Connect wires (2) to domelight terminals. Remove tags.
2.
Position domelight body (1) in place in ceiling and install four screws (6).
3.
Position lens (4) and preformed felt (3) in place on domelight body(1) and install four screws (5).
FOLLOW-ON TASKS:
Connect towing vehicle intervehicular cable to semitrailer (para 2-10).
Test operation
of lckout dome light.
4-39


Back to Top