TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 349 of 462

TM
9-2330-238-14
5-16.
TANDEM
SUSPENSION
BRACKET
REPLACEMENT
(Con’t).
2.
Install six new rivets (3) and four new rivets (4) or new bolts and new locknuts
in tandem
suspension
bracket
(1)
and framerail (2).
3.
Position
bogie
assembly
under semitrailer.
Install six screws,
new Iockwashers,
and nuts on each end of axle
and bracket
assembly
and tandem
suspension
brackets
(1) (para 5-6).
4.
Remove
jackstands
from rear of semitrailer
and lower
semitrailer.
5.
Install
hydraulic
lines to connection
on bases
of tandem
axle (para 4-42).
5-47


Back to Top