TM
9-2330-238-14
5-16.
TANDEM
SUSPENSION
BRACKET
REPLACEMENT
(Con’t).
2.
Install six new rivets (3) and four new rivets (4) or new bolts and new locknuts
in tandem
suspension
bracket
(1)
and framerail (2).
3.
Position
bogie
assembly
under semitrailer.
Install six screws,
new Iockwashers,
and nuts on each end of axle
and bracket
assembly
and tandem
suspension
brackets
(1) (para 5-6).
4.
Remove
jackstands
from rear of semitrailer
and lower
semitrailer.
5.
Install
hydraulic
lines to connection
on bases
of tandem
axle (para 4-42).
5-47