TM-9-2330-324-14-P

TRAILER, CARGO: 1-1/2-TON, 2-WHEEL, M105A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JULY 2002

  TM-9-2330-324-14-P - Page 205 of 350

TM 9-2330-324-14&P
0045 00-1
CARGO TIEDOWN REPLACEMENT
0045 00
THIS WP COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool Kit, General Mechanic’s
Materials/Parts
Lockwashers (24) (Item 17, WP 0061 00)
REMOVAL
NOTE
There are six cargo tiedowns (2) and they are removed the same way.
This procedure covers one cargo tiedown.
Remove four nuts (5), lockwashers (4), flatwashers (3), screws (1), and cargo tiedown (2). Discard
lockwashers.
2
3
4
5
1


Back to Top