TM-9-2330-334-13-P

FAMILY OF MEDIUM TACTICAL VEHICLES (FMTV) LOAD HANDLING SYSTEM TRAILER (LHST) M1147A1

TECHNICAL MANUAL; OPERATOR AND FIELD LEVEL MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

DECEMBER 2013
CHANGE 1

  TM-9-2330-334-13-P - Page 34 of 1184

TM 9-2330-334-13&P
Change 1
0001 00-10
GENERAL INFORMATION/WARRANTY (700,000-719,999)
001 00
WARRANTY - Continued
8. Claim Procedures (Cont).
e. Disposition.
The repair activity shall return defective supplies to the Contractor’s representative
or ship them back at the Contractor’s expense using the replacement part carton/container.
f. Invalid Warranty Claims.
When supplies are inspected by the Contractor/Vendor and found to
be non-warrantable, or the supplies are found to be serviceable, the repair activity submitting the
claim will be required to make reimbursement for Contractor/Vendor services. Additionally, regarding
Contractor/Vendor repair, the local WARCO must stipulate at the time of request for services that
either non-warranty work be stopped at the time it is determined non-warrantable or be prepared to
pay for completion of such work. In either case, the WARCO must be prepared to pay for diagnosis
and trip charges for non-warranty service.
9. Reimbursement for Army Repair.
The Contractor shall remit payment by the fifteenth (15) day of
the month for all warrantable claims by the Government for reimbursement which were received by the
Contractor in the previous month. Payment shall be sent to the PM, MTV, Attn: Business Management
Office, with checks made payable to “The Treasurer of the United States”. In the event that the repair
activity should receive any reimbursement from the Contractor, the monies must be forwarded to the PM,
MTV.
10. Claim Denials/Disputes.
TACOM will handle all denials or disputes.
11. Reporting.
Reporting or recording action on a failed item shall be as specified in DA PAM 738-750
The Army Maintenance Management System (TAMMS). Forms that are unique to the Contractor or Repair
Activity shall not be used.
12. Storage/Shipment/Handling.
a. Storage.
See paragraphs 2, 3.a, 3.c, 5.a and TM Care and Storage Requirements for the Trailer.
b. Shipment.
See paragraphs 3.a, 7.a, 7.c, 8.b, 8.c, 9.d, and 9.e.
c. Handling.
See paragraphs 3.a, 7.a, 7.c, 8.b, 8.c, 9.d, and 9.e.
END OF WORK PACKAGE


Back to Top