TM 9-2330-334-13&P
RAIL ASSEMBLY OPERATION
0005 00
0005 00-1
INITIAL SETUP:
Maintenance Level:
Operator
Equipment Conditions:
Trailer air system charged
GENERAL
The paragraphs in this work package provide the data and procedures to raise and lower the rail
assembly.
RAISING RAIL OPERATION
NOTE
LH and RH flatrack locking pins, outer stowage pins, and DIN blocking plates are
removed the same way.
LH side is shown.
1.
Remove retaining pin (1) from flatrack locking pin (2).
2.
Remove flatrack locking pin (2) from trailer (3).