TM 9-2330-334-13&P
RAIL ASSEMBLY OPERATION - CONTINUED
0005 00
0005 00-3
RAISING RAIL OPERATION - Continued
6.
Install crank handle (7) on gear lug (8).
7.
Rotate crank handle (7) clockwise until flatrack guide (9) is completely raised.
8.
Install flatrack locking pin (2) in trailer (3).
9.
Install retaining pin (1) in flatrack locking pin (2).