TM 9-2330-334-13&P
RAIL ASSEMBLY OPERATION - CONTINUED
0005 00
0005 00-4
LOWERING RAIL OPERATION
1.
Remove retaining pin (1) from flatrack locking pin (2).
2.
Remove flatrack locking pin (2) from trailer (3).
3.
Install crank handle (7) on gear lug (8).
4.
Rotate crank handle (7) counter-clockwise until flatrack guide (9) is completely lowered.