TM 9-2330-334-13&P
RAIL LIFT JACK REPLACEMENT - CONTINUED
0102 00
0102 00-6
INSTALLATION - Continued
5.
Install cotter pin (4) in rail lift jack (5).
6.
Position shaft (3) on rail lift jack (5) with bolt (2) and self-locking nut (1).
7.
Tighten self-locking nut (1) to 16-20 lb-ft (22-27 N·m).
OPERATIONAL CHECKS
1.
Check for proper operation of rail lift jack (WP 0005 00).
END OF WORK PACKAGE