INSTALLATION
00021
1.
Using a floor jack or 12-ton jack, raise axle high enough the tire and wheel assemblies (Figure 1, Items 3 and 2)
can be mounted on axle.
2.
Install tire and wheel assemblies (Figure 1, Items 3 and 2) and 10 nuts (Figure 1, Item 1). Torque nuts to 50 lb-ft (68 Nm).
WARNING
If nuts cannot be torqued, at first opportunity have Organizational Maintenance torque nuts to
proper specifications. If mission allows, stop and check nuts for tightness. Failure to comply may
result in injury to personnel or damage to equipment.
3.
To ensure secure seating of tire, see WP 0097 for correct torquing sequence.
4.
Lower tires (Figure 1, Items 3 and 2) to the ground and torque 10 nuts (Figure 1, Item 1) to 450 to 500 lb-ft
(610 to 678 Nm).
END OF TASK
FOLLOW-ON TASKS
00021
1.
Remove all jacks/stands.
2.
Connect semitrailer to towing vehicle (if required).
3.
Raise landing legs (if required).
4.
Remove/store chocks and ground boards.
5.
Check air pressure for 115 psi (793 kPa).
6.
Ensure proper torque has been applied to nuts.
7.
Store damaged tire and wheel assembly in spare tire carrier and secure (WP 0022).
END OF TASK
END OF WORK PACKAGE