TM-9-2330-342-10

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2012

  TM-9-2330-342-10 - Page 257 of 500

TRANSFER CONTAINER FROM VEHICLE TO TRAILER - Continued
1
2
5
3
4
Figure 12.
Transfer Container From Vehicle To Trailer With CHU.
58.
With the aid of a crank handle (Figure 12, Item 1), rotate ISO lock adjustment screws
(Figure 12, Item 4) on ISO locks (Figure 12, Item 5) clockwise and secure container
(Figure 12, Item 3).
59.
Stow two crank handles (Figure 12, Item 1) in BII stowage box (Figure 12, Item 2).
NOTE
Operator will have to use MAN H.A. and MAN M.F. hydraulic selections
to remove Front Lift Adapter (FLA).
60.
Remove FLA from container (Figure 12, Item 3) and position CHU in accordance with
mission requirements. Refer to vehicle Operator's manual (WP
0057).
61.
Drive vehicle away from trailer. Refer to vehicle Operator's manual (WP
0057).
62.
Set vehicle CTIS tire pressure, refer to vehicle Operator's manual (WP
0057), and
trailer tires (Figure 13, Item 1) (WP
0054) to proper pressure setting.
TM 9-2330-342-10
0026
0026-17


Back to Top