TRANSFER CONTAINER FROM TRAILER TO VEHICLE - Continued
29.
Repeat Steps (25) through (28) for left side ISO lock.
30.
Stow crank handle (Figure 18, Item 1) in BII stowage box (Figure 18, Item 2).
31.
Turn hydraulic selector switch to AUTO position. Refer to vehicle Operator's manual
(WP
0057).
WARNING
Ensure all personnel are clear of the vehicle, trailer, and cart during LHS
operations. Failure to comply may result in serious injury or death to
personnel.
32.
Move joystick to LOAD position. Refer to vehicle Operator's manual (WP
0057).
33.
Continue to load container (Figure 19, Item 2) on vehicle until container (Figure 19,
Item 2) comes in contact with slider (Figure 19, Item 1).
2
1
Figure 19.
Transfer Container From Trailer To Vehicle With CHU.
34.
Release joystick. Refer to vehicle Operator's manual (WP
0057).
TM 9-2330-342-10
0026
0026-25